Basement finishing
From $70 / sq ft, washroom included
- Rec rooms, media rooms, gyms and offices
- Extra bedrooms for a growing family
- Insulated, dry and built to code
Basement finishing and legal basement apartments, plus legalization of the basement unit you already have. Built warm, dry and to code across Vaughan, Brampton, Bradford, Bolton, King and the GTA. One team from permit to final inspection, with a written fixed-price quote.
Most GTA basements are the cheapest square footage you'll ever add to your home.
From $70 / sq ft, washroom included
Starting from $70,000
Starting from $9,000
Many GTA homes, especially in Brampton, already have a basement unit that was never permitted. An unregistered unit can void your insurance, cause problems when you sell, and leave you liable if something goes wrong. We bring it up to code and through inspection so you can rent it with confidence.
Code-size escape windows for bedrooms and second units.
from $5,000Side entrances and walk-ups for a private basement unit.
from $18,000Basement washrooms and full bathroom remodels upstairs.
from $9,000Main-floor kitchens and basement kitchenettes.
from $25,000Use the online estimator or call us for a ballpark in minutes.
We measure, check for moisture, ceiling height, plumbing and electrical, and talk through layouts.
A written, itemized quote, schedule and financing options. No surprise extras.
Permits, trades, inspections and clean-up handled, with a written warranty.
Check these before you spend money on drawings. If your basement falls short, it can usually be fixed, and we price that upfront.
The Ontario Building Code asks for at least 1.95 m (about 77 inches) of clear ceiling height over the required living areas of a basement unit in an existing house.
Ducts, beams and bulkheads can drop lower, but not below about 1.85 m (roughly 72 to 73 inches). Lower than that and the ceiling has to be raised: ducts moved, or the floor lowered or underpinned.
An openable window with at least 0.35 m² (about 3.8 sq ft) of clear opening and no side narrower than 380 mm (15 in). More on egress windows.
A separate entrance, or a shared exit protected with fire separation.
Fire-rated drywall and sealing between the units, plus interconnected smoke and carbon monoxide alarms.
The furnace and water heater room has to be closed off with fire separation, and a sprinkler head is typically needed in that room. Budget for it from day one.
Permit fees and drawings are not included in our per-square-foot prices. On average they come to about $5,000, depending on the city and the project.
Building permit, then building, electrical (ESA) and fire inspections. Some cities also require the unit to be registered.
Do it right once: no fines, no failed inspections, no headaches. We take care of all of it for you.
Plain-language summary of the main rules. Your city's inspector has the final word, and we check your house against the current code during the free review.
For a basement of about 500 to 800 sq ft, plan on about $80 per square foot before HST, including a basic washroom. Larger basements cost less per foot ($75 up to about 1,200 sq ft, $70 above that) and smaller ones a little more. So an 800 sq ft basement is about $64,000. A kitchen adds about $10,000, an extra 3-piece washroom $8,000 to $10,000, and a walk-in shower with mosaic tile and a custom glass door about $3,000. The building permit is extra, about $5,000 on average. Our online estimator and the form at the top of this page give you a ballpark right away.
A typical 700 to 1,000 sq ft basement takes 5 to 9 weeks, depending on permits, whether a bathroom is added, and inspection timing. Legal basement apartments usually take 3 to 5 months including design and permits.
In Toronto and most GTA cities, finishing a basement usually needs a building permit, especially when adding a bathroom, bedroom or moving walls. We tell you upfront and handle the application.
Only if it's built as a legal second unit, with fire separation, proper egress windows, ceiling height and usually a separate entrance. We can build a new legal unit or bring an existing one up to code.
Yes. After the site visit you get a written, itemized fixed price. It only changes if you ask for changes or we uncover hidden damage, which we show you before doing any extra work.
Free in-home assessment and a written, fixed-price quote. No pressure.